Low-pressure injection bonds cracks from the inside out, often in a single visit.

Not every Howard, OH foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Our technicians are trained to tell a cosmetic hairline crack apart from one that signals structural movement, before recommending a fix.
Most crack injection appointments can be scheduled within a day or two of your call.
Pricing is based on crack length and injection material, quoted in writing before we drill any injection ports.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
We also check for bowing alongside stair-step cracks, since that combination can point to a bigger structural issue.
We document crack width and location with photos before and after injection so you have a record of the repair.
Selling a Howard, OH home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
We explain why we're recommending one material over the other so the choice isn't a black box.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Howard Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Howard Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Howard Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Howard Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
We repair cracks of nearly any size — hairline cracks are often the easiest and cheapest to seal before they widen further.
We make the call on-site after inspecting the crack, not before we've seen it.
Most single-crack injections are completed in a few hours during one visit.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Howard, OH buyers, sellers, and lenders commonly request.
We handle foundation crack injection throughout Howard and the surrounding Howard, OH service area, including the zip codes listed below.



Zip codes we serve in Howard, OH: 43028
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.